Quick List to Information

Adobe Acrobat is required to view documents. If you do not have this program, download the FREE software here.

 
T
US 77 Highway Upgrade project area map

Return to Corpus Christi MPO Homepage
Return to Brownsville MPO Homepage
Return to Brownsville Chamber of Commerce Homepage
Return to Harlingen-San Benito MPO Homepage

 

 US 77 Highway Upgrade Project: IH 37 to US 83

The Texas Department of Transportation (TxDOT) is proposing to upgrade US 77 to a controlled access facility that meets interstate standards. The project area extends from the interchange of US 77 and Interstate Highway (IH) 37 in Corpus Christi to the interchange of US 77 and US 83 in Harlingen, with proposed improvements between Robstown and Combes.

The purpose of the proposed project is to improve mobility and safety for traffic traveling on US 77 and for communities along this highway.

Información en español:  El Departamento de Transporte de Texas (TxDOT) está presentando al público una propuesta de convertir la carretera 77 (US 77) a una instalación de acceso controlado que satisface los estándares interestatales. El área del proyecto extiende desde la intersección de la carretera 77 y la carretera interestatal (IH) 37 en Corpus Christi hasta la intersección de la carretera 77 y la carretera 83 en Harlingen, con mejoras propuestas entre Robstown y Combes. 

US 77 Highway

El propósito del proyecto propuesto es mejorar la movilidad y la seguridad de tráfico viajando en la carretera 77 y para las comunidades a lo largo de esta carretera.

 
Round #1 - Public Notice / Serie #1: Aviso Público  

 Round #1 Public Meetings                                                                                                        Back to Top of Page

TxDOT invites the public to its first round of public meetings regarding proposed upgrades of US 77 to a controlled access facility that meets interstate standards. Join us at any of the meetings to learn more about the project, ask questions, provide input and submit comments on issues related to proposed improvements. The same information will be presented at each meeting.

Among the alternatives being considered are alternate routes (relief routes) for the areas of Driscoll and Riviera that would avoid potential community impacts, including residential and commercial displacements. These possible relief routes would likely be tolled and require additional right of way. A limited amount of right of way may be required in certain other areas. The purpose of the proposed project is to improve mobility and safety for traffic traveling on US 77 and for the communities along this highway.
 

US 77 Highway

Open House: 4 p.m. to 7 p.m.
Presentation: 6 p.m.

Serie #1: Reuniones Públicas: TxDOT invita al público a asistir a la primera serie de reuniones públicas sobre la propuesta de convertir la carretera 77 (US 77) a una instalación de acceso controlado que satisface los estándares interestatales. Acompañenos a cualquiera de las reuniones públicas para aprender sobre el proyecto, hacer preguntas, y ofrecer comentarios sobre asuntos relacionados con las mejoras propuestas. Información idéntica se presentará en cada reunión.

Entre las alternativas que son consideradas están incluidas rutas alternativas (carreteras de descongestión) que evitarían impactos potenciales de la comunidad, incluyendo desplazamientos residenciales y comerciales, para las áreas de Driscoll y Riviera. Estas carreteras de descongestión posibles serían carreteras de cuota y requerirían más derecho de paso. Una cantidad limitada de derecho de paso podría ser requerida en ciertas otras áreas. El propósito del proyecto es mejorar la movilidad y la seguridad de tráfico viajando en la carretera 77 y para las comunidades a lo largo de esta carretera

Exhibición Abierta: 4 p.m. to 7 p.m.
Presentación: 6 p.m.

Date/Fecha

City/Ciudad

Location/Lugar

Mon., March 3
3 de marzo

Raymondville

L.E. Franks Tourist Center
501 South 7th Street

Tues., March 4
4 de marzo

Kingsville

Rodeway Inn
3430 US 77 South

Wed., March 5
5 de marzo

Riviera

Riviera ISD Cafeteria
203 Seahawk Drive

Mon., March 10
10 de marzo

Driscoll

Driscoll ISD Cafeteria
410 W. Avenue D

Tues., March 11
11 de marzo

Sarita

Sarita Elementary School Cafeteria
300 E. La Parra Avenue

     
 
   Please submit comments by March 24

 Favor de someter comentarios antes del 24 de marzo

 
Comment Sheet - Public Meetings Forma de Comentarios - Reuniones Públicas
  US 77 Public Meeting Handout Resumen del Proyecto  

 

 Maps and Meeting Exhibits                                                                                                          Back to Top of Page

Environmental Feature Maps:
The project area extends from the interchange of US 77 and Interstate Highway (IH) 37 in Corpus Christi to the interchange of US 77 and US 83 in Harlingen, with proposed improvements between Robstown and Combes.
(Aerials begin at US 77 and SH 44 in Robstown).
 

  Aerial Maps    
  Map 1 Map 2 Map 3 Map 4    
  Map 5 Map 6 Map 7 Map 8    
  Map 9 Map 10 Map 11 Map 12    
  Map 13 Map 14 Map 15 Map 16    
  Relief Route Aerial Maps    
   Driscoll Relief Route  Riviera Relief Route    


Meeting Exhibits:
PowerPoint presentations.

  Raymondville, Kingsville, & Riviera - PowerPoint Presentation / March 3-5, 2008
 
Driscoll - PowerPoint Presentation / March 10, 2008
 
Sarita - PowerPoint Presentation / March 11, 2008

 
Project Map / Mapa del Proyecto
 

 Media Release                                                                                                                           Back to Top of Page

 
 

Media releases regarding the proposed upgrade of US 77:
Comunicados de Prensa referente a las mejoras propuestas de la carretera 77:

February 2008 - Texas Department of Transportation Media Release (English/Spanish)

 
     

 Contact Information                                                                                                                    Back to Top of Page

For more information about this project or the meetings, please call 1-800-490-9933 or 361-884-2626.
Para más información sobre el proyecto o las reuniones, favor de llamar al 1-800-490-9933 o 361-884-2626.

Mail comments to:
Comentarios por escrito deberían ser dirigidos a:

US 77 Highway Upgrade
P.O. Box 3706
Corpus Christi, Texas 78463-3706

 
   

To return to the websites of the Metropolitan Planning Organizations, click on the links below:
Brownsville MPO   |   Harlingen-San Benito MPO  |  Corpus Christi MPO  |  Brownsville Chamber of Commerce

 
 
 

US 77 Highway Upgrade Project: IH 37 to US 83

Round # 1 Public Meetings
Round # 2 Public Meetings (Planned Summer 2008)
Round # 3 Public Hearings (Planned Spring 2009)

Maps & Meeting Exhibits
Media Release
Contact Information

Jacobs Carter Burgess   |   Olivarri & Associates   |   Blanton & Associates   |   Aerial Data Services   |   URS

Texas Department of Transportation